Monday, August 17, 2009

It's been awhile


Lots of sanding and recoating the past couple of months. Dane painted the wings last month and a number of seating parts were finished to a point where they could be awlgriped. Work progressed slowly, summer and boating season you know. Took last week and painted the red in the boat sole and awlgriped the interior parts and the inside of the boat late last week. Assembled the interior over the weekend though the seating will come back out while the deck work proceeds.


























The photos above just begin to suggest the level of finish to the boat interior. I think I will roll the boat over and work on the bottom pror to placing the new deck. That is all for now.












Monday, May 11, 2009

5/2 - 5/11 Working on parts

My shop space is taking on a life of it's own with tools, supplies and parts in various states of completion.
The hull is standing against the wall on it's transom. The transom was drilled in multiple locations to allow epoxy to fill voids where standing water in the bilge caused delamination. A new skin will be veneered over the inside of the transom.




Birch veneers are prepared for the seat supports.

A new skin of birch is bonded to a seat supports.






The Yellow Jacket seat supports were marketed as "spring seating". It is a very interesting feature of the boat. They were constructed of multiple plies of birch laminated to shape and they do work. The supports in this boat were stained from weather as shown above. The new birch skins look great as one can see below. They are very white now but will amber with the finish.









All under a watchful eye with expressive coaching.











Friday, May 1, 2009

Coating parts prior to finishing, 4/26 - 4/28/2009

All of the interior parts have been repaired and sanded. The finishing approach is to coat with a minimun of two coats of UV stabilized epoxy sanding between coats. The final bright finish is up in the air but I am leaning toward either high solids clear Awlgrip or an automotive polyurethane equivilent to economize. In either case the final finish is scheduled to be bullet proof and low maintenance.

Original lumber crayon inventory markings

This is one of the seat bottoms marked "14 Riv F" on the underside. This model is a Monterrey as determined by the deck layout but the seat bottoms are interchangeable with the other five models that used this seating design, the Riviera, Catalina, Capri, Cruisette and the Fury.
This is the other seat bottom with designation in crayon for "14 Cat F". The F probably denotes a front seat but both seats are the same dimension and thus interchangable front and rear. The inconsistent marking may indicate a production date of this boat at a time when inventory was low for parts but that could have been at any time making the point mute. None the less the markings will be preserved in the refit of the boat.




Repairing parts, 4/23/2009

Started to repair and sand the seating parts, 5 hours today.


Friday, April 17, 2009

Sanding of the boat interior


Day 3, after 7 hours of sanding today and 7 hours yesterday the interior of the project is ready for some final detail sanding and I can move on. Some interior base finish will be next. The dash and rear seat back will be prefinished and reinstalled and the new deck can be fabricated.



























Wednesday, April 15, 2009

DEMOLITION! and disassembly

Lots of parts and pieces, tagged and photo-catalogued. Five hours and ready to begin sanding and hull repair.








































































Beginning What a great place to start.


April 14, 2009

Rolled the boat out for baseline photographing. Thes will surely be helpfull when it comes time to reassemble. The record is cool too.